B-1.1, r. 2 - Construction Code

Full text
8.98. Vent piping for an underground tank must have a cross-sectional area sufficient to allow filling or withdrawal at the maximum rate without causing the allowable stress for the tank to be exceeded.
O.C. 220-2007, s. 1.